Section 1: Operations overview and preliminary assessment
If you answered YES to all, complete Launch/Recovery/Max Height and send to CRP.
Tip: Hold Ctrl (Windows) / Cmd (Mac) to select multiple.
Tip: Use these like a go/no-go checklist. If any item is NO → complete Section 2 (JSA).
Section 2: Job safety assessment (JSA)
Complete when outside SOC, >2kg, or official authorisation required.
If you want, paste a Google Maps link and a short description of hazards and boundaries.
Section 3: Approval
Flight authorisation
Section 4: Flight log
Part A (before), Part B (after), Part C (serviceability)
Flight activity log (sorties)
Flight activity (sorties)
Takeoff
Landing
Duration (min)
Aircraft
Battery / Set
Max height (ft)
Notes
Take-off
Landing
Duration (min)
Aircraft
Battery ID
Max height (ft AGL)
Notes / anomalies
Action
Use this for multiple launches on the same job (good for CASA audits). If an anomaly occurs, also record it in the Incident/Hazard area and Technical Log where relevant.
RPAS Technical Log
Parts 1–4: Maintenance schedule/log, Defect log, Daily inspection & time-in-service, Component history card.
Part 1: Maintenance schedule and log
Version 1 – 05/02/2024 template structure
Item #
Maintenance requirement
Due at date / TTIS
Certification (Name / Signature / ARN / Qual.)
Date
Remove
Part 2: Defect Log
Major defects preclude further flight until rectified
Item #
Defect / endorsement & limitations
Date / signature / ARN
Clearing endorsement
Clear date / signature / ARN
Remove
Item #
Defect / endorsement & limitations
Date / signature / ARN
Clearing endorsement
Clear date / signature / ARN
Remove
Part 3: Daily inspection certifications and time-in-service log
Add rows per day/flight
Date
Pilot/MC signature
ARN
Flight (hrs)
Flight (min)
Progressive total
Cycles
Remove
You can use “Progressive total” as a running TTIS like “14h 10m” or “85 cycles”.
Retention reminder: this technical log is to be retained for 7 years after the last time the RPA is operated by the operator.
SWMS / JSA
Store your job-specific safety paperwork with the flight record: SWMS references, toolbox talk sign-on, and a JSA risk table. This is designed for quick field use + printing.
Record which SWMS applies (and version/date). Attach links if stored elsewhere.
#
SWMS name
Version / Date
Link / location (URL, SharePoint, Drive path, etc.)
Acknowledgement (name / ARN / signature)
Date
Remove
Tip: You can list: Drone thermal inspections SWMS, Solar electrical testing SWMS, Roof access / working at heights SWMS, Manual handling SWMS, Traffic management SWMS, etc.
Toolbox talk / pre-start sign-on
Capture attendance + acknowledgement of SWMS/JSA controls.
Name
Role
ARN / Licence
Signature (type name)
Date
Remove
Job Safety Analysis (JSA) – risk table
One line per hazard/task. Keep it practical: hazard → consequence → controls → residual risk.
#
Task / Hazard
Risk / consequence
Controls / mitigation
Residual risk
Owner
Remove
Examples: public exclusion zone, overhead powerlines, RF interference, roof edge/working at heights (if applicable), traffic, animal hazards, battery/charging hazards, hot surfaces, emergency services operations, etc.
Quick Reference
Handy reminders you can keep with the record. (This doesn’t replace CASA documents — it’s a quick checklist.)
Based on CASA 01/17 schedule requirements (keep full instrument separately).